YHA Cosecha Court 2, Phase 2 (Sub-Bids to Total Site Services)

Work of the Project includes the construction of two new residential buildings and one new community building. These buildings will be located on property to the east of Yakima Housing Authority’s Cosecha Court 2 phase 1 project. The two residential buildings will be new two-story wood framed buildings each providing two residential dwelling units. Each building will have space for 84 people to sleep. The new community building will be a new two-story wood framed building. It will provide office space, storage space, a community room and communal laundry facilities. The project will include site work as shown on Architectural, Landscape and Civil plans. The site work will include a new road, pedestrian paths, landscaping and below grade storm water infiltration structures. Fire protection piping shown on the Civil plans is shown for the purpose of coordination with other utilities. This portion of the site utility and interior mechanical systems is not covered by the building permit. The design and installation of this system is the responsibility of the General Contractor and Fire Protection subcontractor, who shall provide the design and licensure required by the City of Granger and the Granger Fire Department to install this system, exterior and interior parts. Street Improvement work is required adjacent to the site as shown on Civil plans and street improvement plans.

Status

Bidding Closed

Prebid Date9/26/19 1:00 pm

Bid Date10/11/19 10:00 am

Company & Contacts

Total Site Services

GC Estimating - Sam Hicks - estimating@tss8a.com Civil Estimating - Shane Picker - bids@tss8a.com   (509) 371-1000

Location

Granger, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

09/26 – A pre-bid conference for the project will be held on Thursday, September 26th at 1:00 at the project site; 399 Cherry Lane Road; Granger, WA 98932.