Interstate 82 Utility Crossings and Extension (Sub-Bids to Total Site Services)
Extension of water and sewer utilities across I-82 to undeveloped property within Prosser’s UGA, including 4,300 LF of 12-inch PVC sewer pipe, 15 manholes, 4,200 LF of 12-inch PVC water main, 28 each 12-inch butterfly valves, 10 fire hydrant assemblies, 275 LF of 30-inch diameter jacked/bored water main steel casing pipe, 275 LF of 30-inch diameter jacked/bored sewer main steel casing pipe, transitions to HDPE pipe within the casings, trench excavation (including rock excavation) and backfill, dewatering, 210 LF of wire fence Type 1, 5 each 14-foot wide single wire gates, and surface restoration.
Status
Bidding Closed
Bid Date9/16/20 4:30 pm