Mill Parkway Roundabout and Butterfield Road (Sub-Bids to Total Site Services)

This contract provides for the construction of phase 1 of the East-West Corridor by constructing a roundabout at the future intersection of realigned Hartford and Butterfield Roads and the new Mill Parkway, reconstructing and widening the south section of Butterfield Road and installing water and sewer lines. This work includes roadway excavation including haul, select borrow including haul, crushed surfacing base course, cement concrete pavement, hot mix asphalt, cement concrete sidewalk, cement concrete traffic curb and gutter, storm drainage, curb ramps, illumination, striping, landscaping, ductile iron water pipe, PVC sanitary sewer pipe and other work, all in accordance with the Contract Plans, these Contract Provisions and the current version of the Standard Specifications.

Status

Accepting Bids

Bid Date6/11/20 2:00 pm

Company & Contacts

Total Site Services

Brandon Larsen brandonl@tss8a.com   (509) 371-1000

Location

Yakima, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.